Wednesday 21 October 2009

Update on Progress on Filming

We decided that it would be a good time to update out blog with information on the progress we were making on filming our music video.

At the moment we are starting to put the raw footage we have collected on our story board and trying to start piecing the music video together in a sequence. So far we have shot the performance parts of the roof, by using a mixture of shots, including tracking shots and a variety of mid and close ups. Within this we have made sure that the shots have continuity by ensuring costume is the same throughout, and trying to film on days when the weather is similar. We have found have found the weather has been one of the problems which we have faced, due to it being autumn the weather is unpredictable and we are vast approaching winter.When we were out filming, during a lesson, we found that the weather was too grim and foggy to film on a rooftop where we were filming, as we couldn’t see any of the buildings or scenery in the distance. The weather was also windy, making it difficult to film. We are going to ensure that we go and capture as much footage as we can, and we will soon start working on our storyline aspect of our video.

No comments:

Post a Comment